Lower Svir HPP, Russia
The low-head run-of-river Lower Svir HPP in the Leningrad region is the second stage of the Ladoga Cascade of HPPs. In operation since 1935. The installed capacity of the HPP is 99 MW, and the mean annual output is 490.5 mil kWh.
i-Energy Power Expert Consulting Inc. elaborated design and engineering works for the hydromechanical equipment using BIM Autodesk Revit, in particular for needle gates with 30 m outlets.
Presentation 2020 rus