Derivative Kashkhatau HPP of 61.1 MW on the Cherek River is located in Kabardino-Balkaria. The HPP is a part of Lower-Cherek Cascade of HPPs and is in operation since 2010.
i-Energy Power Expert Consulting Inc. carried out design works for HPP`s sewage system rehabilitation including: