Yaniskoski HPP, Russia
Construction of Yaniskoski РЗЗ, the first HPP of the Paatsjoki Cascade, began in Finland in 1938, and in 1950 the power plant was restored after the war and commissioned. Through the Paatsjoki Cascade, electricity is exported to Finland and Norway.
The installed capacity of the HPP is 30.2 MW, the mean annual output is 211.250 mil. kWh.
I-Energy Power Expert Consulting Inc. performed design and survey works within modernization of the main transformer, equipment supply, installation and commissioning, as well as field supervision.